Waterproofing Works at ETHOZ GROUP LTD

AllSeal Waterproofing completed waterproofing works at ETHOZ GROUP LTD, 30 Bukit Batok Crescent, Singapore, a commercial/industrial building, covering external window and facade waterproofing, SVP office and toilet area rectification, and RC roof slab torch-on membrane waterproofing.

Project Informations

  • Location

    3 Fusionopolis Way, Singapore

  • Owner

    JTC Corporation

  • Completion Date

    October 27, 2024

  • Project Duration

    60 days

  • Service Provided

    Waterproofing and Exterior Coating Solutions

Project Details

  • 1. Torch-On Membrane Application

    Area Covered: 1500 sqm
    Surface: Reinforced Concrete (RC) Roof
    Description: We applied a durable, torch-on membrane across the RC roof to create a watertight barrier. This membrane is ideal for preventing water seepage, even in challenging weather conditions, thus ensuring the building's longevity.

  • 2. Acrylic Membrane Application

    Area Covered: 1000 m
    Surface: Metal Roof
    Description: We used a high-quality acrylic membrane on the metal roof to protect against rust, corrosion, and water damage. This membrane offers excellent flexibility and UV resistance, enhancing the structure’s durability and reducing maintenance requirements.

  • 3. Exterior Paint

    ○ Scope: Full building exterior
    Description: We provided a weather-resistant, high-quality exterior paint finish that not only enhances the building’s appearance but also contributes to long-term surface protection.

Work Process

Rope access waterproofing works in Singapore

Step 1 – Site Inspection

Our team inspected the external windows, facade joints, sealant conditions, rooftop RC slab surfaces and existing waterproofing areas to identify water entry points, including deteriorated sealant, gaps around window frames, cracks and vulnerable rooftop waterproofing joints.

  • Project Site Assessment

    Symbiosis Tower - Initial inspection to assess existing project conditions and surface requirements.

RC roof waterproofing and leak repair in Singapore
  • Surface Preparation

    Before Image - Cleaning, smoothing, and preparing all surfaces to ensure effective adhesion of waterproofing materials.

Step 2 – Window and Facade Waterproofing (Rope Access Method)

Used rope access to reach the external window and facade areas, rectifying and sealing leakage points around the full window areas.

RC roof waterproofing and leak repair in Singapore
  • Bituminous Primer Application

    Bituminous Primer Application - Applying a bituminous primer on concrete surfaces as a preparatory layer for the torch-on membrane.

Step 3 – SVP Office and Toilet Area Rectification

Carried out waterproofing rectification for the affected SVP offices and male and female toilets, sealing the identified water penetration areas to prevent further leakage.

Step 4 – RC Roof Slab Preparation (approx. 1,000 m²)

Thoroughly cleaned the RC roof slab surface using a high-pressure water jet, then rectified, repaired and sealed existing leakage points and possible leaking areas.

Rope access waterproofing works in Singapore
  • Acrylic Waterproofing Application

    Acrylic Waterproofing Application - Applying an acrylic membrane over the metal roof, ensuring full coverage and sealing all seams.

Step 5 – Torch-On Membrane Installation

Applied two coats of bituminous primer across the roof surface, then installed torch-on waterproofing membrane across approximately 1,000 m² of RC roof slab.

torch on membrane application
  • Torch-On Membrane Application

    Torch-On Membrane Application - Applying the torch-on membrane on the RC roof, creating a durable waterproof barrier.

water ponding test
  • Water Ponding Test

    Water Ponding Test- Conducting a water ponding test to verify waterproofing effectiveness, ensuring there are no leaks or weak points.

Step 6 – Reinforcement and Protection

Applied fibremesh reinforcement along the membrane edges, followed by an alkaline membrane over the fibremesh for additional waterproofing protection.

Step 7 – Project Completion

All contracted waterproofing works were completed within 35 days, covering approximately 1,000 m² of RC roof slab and the specified window, facade, office and toilet leakage areas. Window and facade waterproofing carries a 5-year warranty, and the RC roof slab torch-on membrane waterproofing carries a 10-year warranty.

  • Final Inspection & Cleanup

    Job Completion Image- Conducting a thorough inspection of all work areas, ensuring high standards of quality and cleanliness.

Challenges & Solutions

  • This project required precise coordination and meticulous attention to detail to maintain the integrity of the building’s surfaces.

  • We encountered challenges related to weather conditions and access, especially at elevated and exposed surfaces.

  • Through our commitment to quality and safety standards, we employed advanced equipment and adhered to strict quality protocols, completing the work efficiently and within the designated time frame.